For installation requests of more than 10kW, individual assessments will need to be undertaken by Wellington Electricity to determine whether Distributed Generation (DG) congestion could occur.
DG Congestion occurs when a localised oversupply of power into the network has the potential to create reversed power flows, impacting safety and power quality. The most common constraint is where the export of power into Wellington Electricity’s network causes the voltage to exceed regulatory limits. Changing network conditions may also result in previously accepted distributed generation applications creating subsequent issues on the network.
Under these circumstances Wellington Electricity may require the distributed generation operator to curtail or disconnect the distributed generation, operate within nominated times and/or with conditions. The curtailment may be restricted to any or all of the distributed generation operators on the part of the network experiencing congestion.
For more information please see Wellington Electricity's Congestion Curtailment and Interruption Policy here.
Distributed generation export congestion map
Before using this map, please make sure you read our Terms of Use below
Wellington Electricity Terms of Use for our distributed generation (DG) export congestion map
By accessing the DG export congestion map (Data) on, or from, this website, you as the user (User) agree to and acknowledge the following terms of use:
1 The Data is provided on an “as is” basis. Wellington Electricity Lines Limited (Wellington Electricity):
(a) excludes all representations and warranties relating to the Data, including in relation to the completeness of and/or any inaccuracies or omissions within the Data; and
(b) shall have no liability to any User for any kind of loss, damage, cost or liability whatsoever, including for any loss or damage arising out of or in connection with the User’s use of or reliance on the Data, whether or not such loss or damage:
(i) was foreseeable;
(ii) arose in the normal course of things; or
(iii) Wellington Electricity was advised by the User of the possibility of the loss or damage.
2 The User waives its right to make any claim against Wellington Electricity relating to or in connection with the use of or reliance on the Data.
The Data is approximate and is provided for illustrative purposes only. It may not be up-to-date, and may not necessarily be complete or accurate.
3 The User acknowledges and agrees not to rely upon the Data for any planning, design, construction, other works or otherwise.
4 The User shall indemnify Wellington Electricity against all claims brought against Wellington Electricity by third parties that arise from the User’s use or reliance on the Data.
5 The User warrants and undertakes not to distribute to third parties, repurpose or commercialise this Data in any way without the express permission of Wellington Electricity. Use of the Data is strictly for personal reference only.
If you have any questions, please email WE_Connections@welectricity.co.nz.
Regulated Terms
In the majority of distributed generation connections (once completed) the Electricity Authority's Regulated Terms from the Code Part 6.2 will apply. However Wellington Electricity and the distributed generator may enter into a connection contract at any time and these contract terms shall take precedence. If contracted terms cannot be negotiated and agreed within 30 days following notice to Wellington Electricity of the intent to form a contract then the Regulated Terms shall apply. Any changes to contracted terms shall be by mutual agreement.
The Electricity Industry Participation Code 2010 can be found here.